DWG № 001  ·  RENOVATION EXPERTS  ·  NCR

Every renovation, engineered.

Before you spend ₹10–50 lakhs on renovation, get an independent engineering diagnosis. Then watch it executed through seven quality gates — with your money released only when quality is verified on site.

07Quality gates on
every project
₹999Engineering health
check, to start
100%Payments tied to
verified milestones
5 YRWritten waterproofing
warranty

DWG № 002 · THE PROBLEM

Renovation fails in four
predictable ways.

Every renovation horror story maps to one of four sources of variance. Contractors manage none of them. Our entire delivery system exists to eliminate them, one by one.

V–01

Unmanaged labor

Untrained gangs, no supervision, no accountability. Whoever shows up that morning decides your quality.

→ Our fix: a named site engineer on every project, 1 per 2–3 sites.

V–02

Surprises behind the wall

Seepage, weak slabs, dead plumbing — discovered mid-project, blowing up your cost and timeline.

→ Our fix: engineering diagnosis before we quote a single rupee.

V–03

Scope creep

Lump-sum quotes with vague line items, renegotiated halfway through when you can no longer walk away.

→ Our fix: fixed itemized BOQ. Changes only via documented change-orders.

V–04

Material substitution

The brand you paid for isn't the brand in your wall — and you'll never know, because nobody logged it.

→ Our fix: approved brand lists, photographed challans, logged against BOQ.

DWG № 003 · START HERE

The Renovation
Health Check

Just as no treatment should begin without a diagnosis, no renovation should begin without an inspection. A qualified civil engineer examines your home and hands you an engineering-grade report — before anyone quotes you anything.

  • Site inspection — structural, waterproofing, electrical & plumbing condition, documented in photos and video.
  • Itemized budget estimate — BOQ-grade, line by line. Not a lump sum.
  • Risk register — what could surprise us behind the wall, and the cost band if it does.
  • Renovation roadmap — the correct sequence of work, in engineering order.

Yours to keep. Use it with us, or with any contractor you choose.

DWG № 003-A · COST ESTIMATOR

What should your
room cost?

Pick a room, enter its size, choose your scope — and get an indicative range that reads like a real BOQ, line items included. No phone number required.

01 · Select room

02 · Room dimensions

ft
×
ft
48 sq ft

03 · Scope of work

DWG № 004 · THE DELIVERY SYSTEM

Seven gates. No shortcuts.
No exceptions.

Your project moves through seven stages. Each gate closes only when the quality checklist passes — with photo and video evidence on record. Until a gate passes, the next stage doesn't start and the next payment doesn't release.

01

Protection & Demolition

Floors covered, surfaces protected, debris protocol active, structure treated with care.

02

Civil & Structural

Masonry and slab work with engineer sign-off on every structural item.

03

Waterproofing

Its own dedicated gate — mandatory ponding and leak tests. India's #1 renovation failure, never skipped.

04

Electrical & Plumbing

Pressure and circuit tests. Every concealed line photo-mapped before a single wall closes.

05

Flooring & Finishes

Level checks, alignment, and materials verified against your BOQ, brand by brand.

06

Painting & Fit-out

Surface prep verified before paint. Final fittings installed and checked.

07

Snag & Handover

Joint inspection with you, snags closed, and a documented handover file for life.

HOW YOUR MONEY MOVES
1 · Held

Your payment sits against milestones — not in a contractor's pocket.

2 · Verified

The stage passes its QC gate with evidence recorded on the system.

3 · Released

Only then does the milestone payment release. Quality is enforced by mechanism, not trust.

DWG № 005 · IN WRITING

The ten delivery promises.

Not values on a wall. Terms in your contract.

  1. 01Engineering diagnosis before any quote
  2. 02Itemized, fixed BOQ — no lump sums
  3. 03Money in milestone escrow, released on verified quality
  4. 04A named engineer supervising your site
  5. 05Photo evidence of concealed work before walls close
  6. 06Daily updates on your phone
  7. 07A clean, protected, professional site every day
  8. 08Committed timeline with a stated delay policy
  9. 09Documented handover with concealed-work maps & invoices
  10. 10Written warranty — 12 months workmanship, 5 years waterproofing

DWG № 006 · FOR CIVIL ENGINEERS

Built by engineers.
Run by engineers.

India has lakhs of qualified civil engineers and no ecosystem that turns them into renovation entrepreneurs. RECP — the Renovation Experts Certified Partner program — is that path: learn the system from inside our projects, then run your own on it.

Apply to become an RECP
  1. Associate

    Verified civil engineer. Community, training, professional profile.

  2. Certified

    Work as a paid site & audit engineer inside our projects — the apprenticeship.

  3. Pro

    Execute turnkey projects on our system: our BOQ, our gates, our escrow, our brand.

  4. Elite

    City partner. Multi-team operations, mentoring new partners, territory growth.

DWG № 007 · QUESTIONS

Asked, answered.

Why should I pay for an inspection when contractors visit for free?

A free site visit is a sales call — its job is to win your project, so problems get minimized and estimates stay vague. Our Health Check is a paid engineering service: its only job is to tell you the truth about your home, in writing, with photographs. The report is yours to use with anyone.

Do you execute the renovation yourselves?

Yes. Projects are delivered by our own execution pods — a named project manager, dedicated site engineers, and empanelled labor teams — running on our stage-gate system. As we grow, certified partner engineers (RECPs) execute on the same system, under the same gates and escrow.

What does "milestone escrow" actually mean for me?

You don't hand over large advances. Your money is held against defined milestones and releases only when that stage passes its quality gate with recorded evidence. If quality isn't verified, payment doesn't move. Simple.

What if something fails after handover?

Every project carries a written warranty — 12 months on workmanship and 5 years on waterproofing — plus proactive check-in visits at 30 days and 11 months. Your handover file includes concealed-work photo maps, so future repairs never mean blind demolition.

Which areas do you serve?

We're launching across NCR — Gurgaon first, with Delhi, Noida, Faridabad and Ghaziabad following. Book a Health Check and we'll confirm coverage for your society.

DWG № 008 · WORK ORDER

Book your Renovation
Health Check.

Tell us about your home. Our team will call within one working day to schedule your engineer's visit.

✓  No obligation to renovate with us

✓  Report is yours to keep, whoever you hire

✓  Fee adjusted against your project if you proceed

Prefer to message us?

By submitting, you agree to be contacted about your inspection and to our Terms and Privacy Policy. No spam, ever.

WhatsApp us